Job: RAAF Amberley - Stage 3 Package 5
Client: Broad Constructions
Tonnage: To be updated
Date Commenced: To be updated
Duration Of Scope: To be updated
Specification:

Welding:
Fabrication: AS4100
Protective Coating: Hot Dipped Galvanized


Description :

To Supply, Fabricate, Galvanize and erect 250t of Structural Steel as per clients specification. Also to hold a national code compliant certificate.The project consists of 5 main buildings. large warehouse style building, offices and fire fighting sites. The project was 100% galvanized as per clients request. Cranage on site included, 50t liebherr, 30t Zoomloin, 25t KATO, 22t KATO right down to a 1.9t mini TOA. Telehandler, boom and scissor lifts. Alot like RAAF Amberley, stage 3 package 4 the frame was a requirement and we completed this project on-time.